Product/Service

ADD3 Capacity Improvement System

Source: Tensar Earth Technologies, Inc.
An ADD3 Capacity Improvement System is a custom-engineered reconfiguration of a waste containment facility that maximizes disposal capacity while meeting all regulatory requirements and enhancing the overall revenue potential of the site.
An ADD3 Capacity Improvement System is a custom-engineered reconfiguration of a waste containment facility that maximizes disposal capacity while meeting all regulatory requirements and enhancing the overall revenue potential of the site. Within existing boundary constraints, an ADD3 System allows landfill expansion, thereby increasing the waste flow and extending the facility's service life. The systems can be used to:
  • Increase the revenue and profitability of landfill operations
  • Construct landfills over marginal foundation soils
  • Structurally support new landfills built on top of existing landfills
  • Build safe, structurally stable, steeper slopes to reduce land requirements and increase capacity
Tensar Earth Technologies, Inc., 5775-B Glenridge Dr., Suite 450, Atlanta, GA, 30328. Phone: 404-250-1290; Fax: 404-250-9185.