ESG Breaks Ground On Landfill Methane Recovery Site
"We are excited to break ground today and move this project from design to reality," said Jim Adams, president of ESG. "This $5 million project is an ideal fit for Energy Systems Group and our vision to find opportunities that deliver environmentally friendly solutions which improve our client's finances, productivity and efficiency."
The new facility will capture methane that was previously burned off at the landfill and in-turn, reduces local emissions. Applying an innovative membrane filtration system, ESG will be able to process as much gas energy as would be used in more than 5000 local homes. This facility also significantly improves the local community air quality by reducing the carbon dioxide – greenhouse gas – emissions by the equivalent of removing more than 3,700 cars from the roads or planting more than 4,400 acres of trees.
"This is a great day for our city" said Mayor Steve Darden. "With this processing plant, our community gains a long-term revenue source, reduced air emissions, and a local renewable energy source. And with Energy Systems Group we gain a great partner in energy efficiency and community stewardship."
Construction of the plant includes installation of a filtration and compression system at Iris Glenn landfill and a four-and-a-half mile pipeline to provide the cleaned methane to the local industrial customers. The plant is scheduled to become operational this fall.
SOURCE: Energy Systems Group