-
Total Cost Assessment (TCA)
9/23/1999
Total Cost Assessment (TCA) is an enhanced financial analysis tool that is used to assess the profitability of alternative courses of action (e.g., raw material substitution to reduce the costs of managing the wastes generated by a process; an energy retrofit to reduce the costs of energy consumption).
-
Weighing System
9/20/1999
The RO/WM (route optimization and weight management) system provides management with accurate data time and weight
-
Textile Plant's Land-applied-sludge Odor is Controlled
8/24/1999
A textile plant in the Southeast was leasing farmland for the application of its waste treatment plant sludge. The sludge had a high concentration of ammonia
-
Vehicle Washing System
8/20/1999
Engineered for cleaning trucks and heavy equipment, the automated Powerwash vehicle wheel and undercarriage washing system operates in a range of site situations
-
MapViewer Demo
8/4/1999
MapViewer fills a niche between a standard drawing package and a full Geographic Information System (GIS). MapViewer belies its name by being a complete map drawing and creating application in its own right.
-
Bulk hauler
7/7/1999
This weight sensitive bulk hauler is designed to save pounds without sacrificing power, durability or driver comfort
-
Materials Handling Conveyor
7/7/1999
Featuring cross-rigid base belt construction coupled with the company’s sidewall design, the Pli-O-wall can keep material in place in most configurations including free-flowing materials
-
Erosion Control Blankets
6/17/1999
Designed for sensitive but tough erosion control, BioNet erosion control blankets are made of straw, straw/coconut or coconut fibers stitched into or between full biodegradable nettings of jute yarn
-
PLC-controlled Hopper Gates Prevent Accumulated Sludge
6/16/1999
The East Bay Municipal Utility District (EBMUD) sewage-treatment plant for Oakland, CA, faced a possible shipment bottleneck of sludge
-
Landfill Mining/Recycling Test a Success
5/28/1999
Construction and demolition debris buried at the Collier County Landfill, Naples, FL, for 15 to 18 years has been reclaimed and successfully